奔驰宝马游戏大厅,奔驰宝马电玩城下载

Marine Engineering
Breakwater for Costa Azul LNG Terminal,Mexico
source: Author: 2015-01-22 Date: 2021-01-23 Font size: [large medium small]
 


Design and construction 700m long and 25m water deep breakwater in 300m offshore, installation of 18no. Precast concrete caissons which are 32m wide, 36m long and 25.5m high, weighs 17,000 tons.