Port of Balboa Container Terminal Development Phase 3
source: Author: 2015-01-22 Date: 2020-08-04 Font size: [large medium small]
 

Design and construct of berth for post-Panamax container vessels and feeder vessels in the range of 1,000 dwt to 80,000 dwt, quay panel of which is 50 years design life. It comprises a 270 m long quay deck structure, dredging works, reclamation works approx. 7.5 hectares, a link bridge between two existing piers, paving, provision of RTG crane runways and reefer facilities.