奔驰宝马游戏大厅,奔驰宝马电玩城下载

Dredging & Reclamation
Maintenance Dredging of Access Channel for Port Authority of Douala, Cameroon
source: Author: 2015-01-22 Date: 2020-07-21 Font size: [large medium small]
The navigation channel to be dredged is 18km long, and the designed depth to be dredged is -7m. The total works are divided into 4 milestones within a period of 24 months. The first milestone was finished within for month with the amount of dredging 250,000 m3.