奔驰宝马游戏大厅,奔驰宝马电玩城下载

Dredging & Reclamation
Lamma Power Station – Navigation Channel Improvement, Hong Kong
source: Author: 2015-01-22 Date: 2020-07-21 Font size: [large medium small]
This Project comprises of dredging of existing navigation channel leading to the HEC Lama Power Station Quay. Dredged level is -16.0m PD.