奔驰宝马游戏大厅,奔驰宝马电玩城下载

Railway
The Ampang (AMG) Line Extension Project – Track Works, Malaysia
source: Author: 2015-01-22 Date: 2020-09-08 Font size: [large medium small]


The Ampang (AMG) Line Extension starts from Sri Petaling Station and ends at Putra Heights to serve the highly populated residential and commercial areas. The extension line is approximately 18km long with 12 elevated stations, and a new depot shall be provided to accommodate the new LRV vehicles. The track work started in April 2014 and still ongoing.